All members of our painting team paint at the same rate. If $15$ members can paint a specific wall in $45$ minutes, then how long would it take $20$ members to paint the same wall, in minutes?
15 members x 45 minutes = 675 member miunutes required
675 member minutes / 20 members = 33 3/4 minutes will be needed.