+0  
 
+1
3475
1
avatar

One electrician charges a $50 service call fee plus $25 per hour for labor. Another electrician charges a $35 service call fee plus $27.50 per hour for labor. How long would a job take if the total cost for each electrician is the same?

 Dec 15, 2015
 #1
avatar
0

One electrician charges a $50 service call fee plus $25 per hour for labor. Another electrician charges a $35 service call fee plus $27.50 per hour for labor. How long would a job take if the total cost for each electrician is the same?

 

Let the time needed=T, then we have:

25T +50=27.50T +35

 

Solve for T:
25 T+50 = 27.5 T+35

27.5 T+35 = (55 T)/2+35:
25 T+50 = (55 T)/2+35

Subtract (55 T)/2+50 from both sides:
-(5 T)/2 = -15

Multiply both sides by -2/5:
Answer: | T=6 Hours
 

 Dec 15, 2015

2 Online Users

avatar