MachineA takes 15 mins and Machine B takes 30 min to do the same job how long do they take to do the job together????
1/30 + 1/15 = 1/x x is the minutes required when both working together.
1/30 + 2/30 = 1/x
3/30 = 1/x
x = 10 minutes