+0  
 
+5
844
1
avatar+22 

A road is 5/9 of a mile long. A crew needs to repave 2/3 of it. How long is the section that needs to be repaved?

 Oct 8, 2015

Best Answer 

 #1
avatar+130551 
+10

(5 / 9)  * (2 /3)  =

 

10 / 27   miles

 

 

cool cool cool

 Oct 8, 2015
 #1
avatar+130551 
+10
Best Answer

(5 / 9)  * (2 /3)  =

 

10 / 27   miles

 

 

cool cool cool

CPhill Oct 8, 2015

1 Online Users