Sue can shovel snow from her driveway in 35 minutes. Bill can do the same job in 40 minutes. How long would it take SueSue and BillBill to shovel the driveway if they worked​ together?

 Jul 27, 2016
 #1
avatar
0

Sue can shovel snow from her driveway in 35 minutes. Bill can do the same job in 40 minutes. How long would it take SueSue and BillBill to shovel the driveway if they worked​ together?

 

Sue can shovel snow faster than Bill?

 

Sue can finish 1/35 of the job in 1 minute.

Bill can finish 1/40 of the job in 1 minute.

1/35 + 1/40 =3/56 Their combined rate in 1 minute. Therefore, both working together can finish th job in:56/3=18 2/3 minutes.

 Jul 27, 2016
 #2
avatar+37103 
0

Look at it as a RATE problem......

One job = 1

Bill's rate =  1/40  job/minutes

Sue's rate=  1/35 job/minutes

 

What is the RATE when they BOTH work ?

 

(1/40 + 1/35)   job/minutes  =  (7+8)/120 = 15/280  Job/minutes

 

the TIME to complete ONE job = ONE Job / RATE   so, substitute:

1 Job / (15/280 Job/Minutes) = 280/15 minutes = 18.67 minutes