All members of our painting team paint at the same rate. If $45$ members can paint a specific wall in $60$ minutes, then how long would it take $12$ members to paint the same wall, in minutes?
45 mem * 60 min = 2700 mem min required to paint the wall
2700 mem min / 12 mem = 225 minutes for 12 members to paint the same wall
45 mem * 60 min = 2700 mem min required to paint the wall
2700 mem min / 12 mem = 225 minutes for 12 members to paint the same wall