stew is installing drain pipe that requires a bend in it. the first part of the drain pipe is 6.4 m long and makes an angle of depression of 17 degrees with the surface of the ground. the second part of the drain pipe is 5.2 m long and makes an angle of depression of 37 degrees with the horizontal. How many meters below the surface of the ground is the end of the drain pipe?