Don't take those two seriously. They are a bunch of pranksters. You should direct your physics questions to "Alan" one of the moderators here, since he is very good at answering physics questions.
=48x^15
Can you plz explain HOW you got the answer.
CPhill is right
thx
25mi/hr x [ 1hr / 60 min ] x [ 1609.344m/ 1 mile ] = 670.56m/min
i make 970 per week what is my salery
Since there are 52 weeks in one year, then:
52 X 970=$50,440 Your salary for 1 year.
-10a(10)-2a(2) =
-100a - 4a =
-104a
5/14-2/21
=11/42
Gross pay = total pay before deductions are taken out
Net Pay = total pay after deductions
Gross pay is before the government takes its taxes and other deductions. Net pay is what is left.
8:20 - 12: 05 = 3hrs 45mins = 3 + 45/60 hrs = 3 + 3/4 hrs = 3.75 hrs
1:15 - 6:00 = 4 hrs 45 mins = 4 + 45/60 hrs = 4 + 3/4 hrs = 4.75 hrs
So ..... 3.75 + 4.75 = 8.5 hrs
3*1/4=3/4
0.75
Thank You
6a and -6a cancel out when added together
thus you are left with the -8
the answer is -8
i dunno too
zero is the answer
6.9699091e+19
i dunno
=670.6 m/min (meters per minute)
Assuming we have
[z+6]/[z-9]= [ - 11] / [10] cross multiply
10[z + 6] = -11[z - 9] simplify
10z + 60 = 99 - 11z add 11z to both sides subtract 60 from both sides
21z = 39 divide both sides by 21
z = 39/21 = 13/7